Working with landscape maintenance contractors
[edit] Introduction
A well-designed and maintained landscape can attract people to a site and can have a positive impact on property value and personal wellbeing. With more elaborate landscaping, it is fairly common for facilities managers or other property management professionals to outsource maintenance responsibilities to a company that specialises in grounds maintenance.
[edit] Preparing a contract
As is the case with other specialist contractors, it is important to include essential information in tender documentation, such as:
- Identification of the parties involved, addresses, names, licenses, qualifications, insurance and so on.
- Services offered, including specifics that are agreed upon as well as those being excluded. Some examples include:
- Core tasks such as grass cutting, turf, hedge, tree and bed maintenance, maintenance, removal and disposal of landscaping waste and so on.
- Optional tasks such as replacement of trees, bulbs, hedges, shrubs and so on (including the design and maintenance of replacement bedding schemes, if necessary).
- Seasonal planting and cleanup schedules.
- Clarification regarding damage to property (including irrigation systems that may be used).
- Agreements regarding maximum and minimum height levels for grass, grass edging and hedges and other landscape elements.
- Requirements for maintenance and monitoring of moisture detection systems (to ensure irrigation systems do not activate when it’s unnecessary).
- Special environmental concerns (such as schools or other sensitive adjacent areas or ecosystems to be protected from pesticides, fertilisers or pest control measures).
- Notification procedures and documentation for application of any potentially harmful chemicals (such as pesticides).
- Inclusion (or exclusion) of car park maintenance, and tasks such as ice removal or other safety issues.
- Inclusion (or exclusion) of specific activities such as weed control, mulching, leaf collection and removal and so on.
- Equipment storage.
- Procedures for reporting and dealing with vandalism.
- Arrangements when safety restrictions or exclusion zones must be put in place (particularly when landscaping work requires the placement of safety barriers).
- Fees (typically for work completed), including payment plans and form of payment.
- Key dates, including start and finish dates.
- Arrangements regarding access to locked or restricted areas.
It is also helpful to have an inventory of trees, shrubs and other types of landscaping on the site. In order for the list to be suitable for the contract specifications, it should include details such as size, age, condition and maintenance requirements of each item.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The remarkable story of a Highland architect.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.
Access, history and Ty unnos.
The world’s first publicly funded civic park.
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building photo contest 2024 winners
Fresco School by Roman Robroek and Once Upon a Pass by Liam Man.